Arc Furnace II

From Captain of Industry Wiki
Revision as of 09:53, 29 January 2022 by Thadius856 (talk | contribs) (: {{Recipe}} -> {{recipe define}})
Jump to: navigation, search
Metallurgy & Smelting.png
Arc Furnace II
T2
Arc Furnace II.png
This furnace has a cooling system to safely reach higher operating temperatures. This provides increased throughput and an opportunity to reuse some of the excess heat. Power requirements are increased as well.
Construction
Construction Parts III.png
180
+
Steel.png
180
+
Electronics.png
40
WorkersWorker.png 24
ElectricityElectricity.png 2 MW
MaintenanceMaintenance II.png 2.0 / 60 Clock.png
Footprint9x6
Required ResearchArc Furnace II
DesignationMetallurgy & Smelting Metallurgy & Smelting.png
VariantsArc Furnace

An Arc Furnace II is a direct upgrade from the Arc Furnace machine. It carries twice the already-hefty Worker and Electricity requirement in addition to Water, some of which can be recovered by passing the byproduct Steam (High) through Cooling Towers. In exchange, it doubles throughput of Silicon smelting.

Additionally, it incorporates smelting recipes for Iron Ore Crushed, Copper Ore Crushed, and Glass Mix similar to those available in the Blast Furnace II which make it possible to replace all Blast Furnace II machines on the island. Notable differences between these recipes are that the Arc Furnace II requires a small amount of Graphite instead of a large amount of Coal. This change reduces the overall Coal requirement drastically for smelting Iron or Copper by 87.5% (12 /60s vs 1.5 /60s) and for smelting Glass by 90% (15 /60s vs 1.5 /60s). Both recipes also produce 50% less Exhaust per unit produced.

Recipes