Metal Caster II

From Captain of Industry Wiki
Jump to: navigation, search
Metallurgy & Smelting.png
Metal Caster II
T2
Metal Caster II.png
Casts molten materials into slabs.
Construction
Construction Parts II.png
40
+
Steel.png
20
WorkersWorker.png 3
ElectricityNone
MaintenanceNone
Footprint7x5
Required ResearchAdvanced Smelting
Boost by UnityAvailable
DesignationMetallurgy & Smelting Metallurgy & Smelting.png
VariantsMetal Caster

The Metal Caster II is a direct upgrade of the Metal Caster machine. It is used to cast Molten Iron into Iron and Molten Copper into Impure Copper. It features an identical footprint, input/output locations, and recipe ratios with the only differences being a higher overall throughput and the requirement of 1 additional Worker. Visually the machine is identical to its predecessor with the exception of the crane supports and built-in conveyor belt being yellow.

Recipes

Below are all the recipes, which this building is capable of producing. Note, that some of them may be locked behind Research, and not immediately available in your game.

8
Molten Copper.png
24
20 Clock.png
Transform.png
60 Clock 60s.png
8
Impure Copper.png
24
8
Molten Iron.png
24
20 Clock.png
Transform.png
60 Clock 60s.png
8
Iron.png
24