Cooled Caster II

From Captain of Industry Wiki
Revision as of 07:15, 22 January 2022 by Thadius856 (talk | contribs) (: +navbox)
Jump to: navigation, search
Metallurgy & Smelting.png
Cooled Caster II
T2
Cooled Caster II.png
Casts molten materials into slabs. This one also utilizes water for cooling to speed up the process.
Construction
Construction Parts II.png
30
+
Construction Parts III.png
20
WorkersWorker.png 4
ElectricityNone
MaintenanceNone
Footprint7x5
Required ResearchAdvanced Smelting
DesignationMetallurgy & Smelting Metallurgy & Smelting.png
VariantsCooled Caster

The Cooled Caster II is a direct upgrade of the Cooled Caster machine. It features an identical footprint, input/output locations, and recipe ratios with the only difference being a higher overall throughput. Visually the machine is identical to its predecessor with the exception of the crane supports and built-in conveyor belt being yellow.

Recipes

8
Molten Steel.png
20
Plus.png
2
Water.png
5
24 Clock.png
Transform.png
60 Clock 60s.png
8
Steel.png
20