Metal Caster II

From Captain of Industry Wiki
Revision as of 01:00, 18 August 2022 by NaK (talk | contribs) (Update parameters in infobox machine)
Jump to: navigation, search
Metallurgy & Smelting.png
Metal Caster II
T2
Metal Caster II.png
Casts molten materials into slabs.
Construction
Construction Parts II.png
40
+
Steel.png
20
WorkersWorker.png 3
ElectricityNone
MaintenanceNone
Footprint7x5
Required ResearchAdvanced Smelting
DesignationMetallurgy & Smelting Metallurgy & Smelting.png
VariantsMetal Caster

The Metal Caster II is a direct upgrade of the Metal Caster machine. It is used to cast Molten Iron into Iron and Molten Copper into Impure Copper. It features an identical footprint, input/output locations, and recipe ratios with the only differences being a higher overall throughput and the requirement of 1 additional Worker. Visually the machine is identical to its predecessor with the exception of the crane supports and built-in conveyor belt being yellow.

Recipes

8
Molten Copper.png
24
20 Clock.png
Transform.png
60 Clock 60s.png
8
Impure Copper.png
24
8
Molten Iron.png
24
20 Clock.png
Transform.png
60 Clock 60s.png
8
Iron.png
24