Metal Caster II
From Captain of Industry Wiki
Revision as of 09:53, 29 January 2022 by Thadius856 (talk | contribs) (→: {{Recipe}} -> {{recipe define}})
Construction | |
Workers | 3 |
Electricity | None |
Maintenance | None |
Footprint | 7x5 |
Required Research | Advanced Smelting |
Designation | Metallurgy & Smelting |
Variants | Metal Caster |
The Metal Caster II is a direct upgrade of the Metal Caster machine. It is used to cast Molten Iron into Iron and Molten Copper into Impure Copper. It features an identical footprint, input/output locations, and recipe ratios with the only differences being a higher overall throughput and the requirement of 1 additional Worker. Visually the machine is identical to its predecessor with the exception of the crane supports and built-in conveyor belt being yellow.
Recipes
General Machines | |
Water Extraction & Processing | |
Food Production | |
Metallurgy & Smelting | |
Power Production | |
Crude Oil Refining | |
Waste Management | |
Transports | |
Storage |
|
Buildings | |
Buildings (For Vehicles) | |
Housing & Services | |
Cargo Docks |
|
Landmarks | |
Planned or Proposed | |
* Only available in the Supporter Edition |