Difference between revisions of "Metal Caster II"

From Captain of Industry Wiki
Jump to: navigation, search
m (: {{Recipe}} -> {{recipe define}})
m (: +{{recipe fetch|isbldg=yes}})
Line 33: Line 33:
   | Output1Qty  = 8
   | Output1Qty  = 8
}}
}}
{{recipe fetch|isbldg=yes}}


{{Navbox/Machines}}
{{Navbox/Machines}}

Revision as of 10:01, 29 January 2022

Metallurgy & Smelting.png
Metal Caster II
T2
Metal Caster II.png
Casts molten materials into slabs.
Construction
Construction Parts III.png
20
WorkersWorker.png 3
ElectricityNone
MaintenanceNone
Footprint7x5
Required ResearchAdvanced Smelting
DesignationMetallurgy & Smelting Metallurgy & Smelting.png
VariantsMetal Caster

The Metal Caster II is a direct upgrade of the Metal Caster machine. It is used to cast Molten Iron into Iron and Molten Copper into Impure Copper. It features an identical footprint, input/output locations, and recipe ratios with the only differences being a higher overall throughput and the requirement of 1 additional Worker. Visually the machine is identical to its predecessor with the exception of the crane supports and built-in conveyor belt being yellow.

Recipes

8
Molten Copper.png
24
20 Clock.png
Transform.png
60 Clock 60s.png
8
Impure Copper.png
24
8
Molten Iron.png
24
20 Clock.png
Transform.png
60 Clock 60s.png
8
Iron.png
24