Difference between revisions of "Metal Caster II"

From Captain of Industry Wiki
Jump to: navigation, search
m (: +navbox)
m (: {{Recipe}} -> {{recipe define}})
Line 19: Line 19:


==Recipes==
==Recipes==
{{Recipe
{{recipe define
   | Input1Name  = Molten Iron
   | Input1Name  = Molten Iron
   | Input1Qty  = 8
   | Input1Qty  = 8
Line 26: Line 26:
   | Output1Qty  = 8
   | Output1Qty  = 8
}}
}}
{{Recipe
{{recipe define
   | Input1Name  = Molten Copper
   | Input1Name  = Molten Copper
   | Input1Qty  = 8
   | Input1Qty  = 8

Revision as of 09:53, 29 January 2022

Metallurgy & Smelting.png
Metal Caster II
T2
Metal Caster II.png
Casts molten materials into slabs.
Construction
Construction Parts III.png
20
WorkersWorker.png 3
ElectricityNone
MaintenanceNone
Footprint7x5
Required ResearchAdvanced Smelting
DesignationMetallurgy & Smelting Metallurgy & Smelting.png
VariantsMetal Caster

The Metal Caster II is a direct upgrade of the Metal Caster machine. It is used to cast Molten Iron into Iron and Molten Copper into Impure Copper. It features an identical footprint, input/output locations, and recipe ratios with the only differences being a higher overall throughput and the requirement of 1 additional Worker. Visually the machine is identical to its predecessor with the exception of the crane supports and built-in conveyor belt being yellow.

Recipes