Difference between revisions of "Forestry Control Tower"

From Captain of Industry Wiki
Jump to: navigation, search
m (: Fix typo)
(Added some math to compute the size of the forestry area needed per assembler)
Line 67: Line 67:
|}
|}


== More Math ==
Using the math above the wood generated per sapling per month ({{time}}) can be computed.
{| class="wikitable"
!Option
!Years
!Wood
!Wood/sapling/year
!Wood/sapling {{time}}
|-
|100%
|12
|20
|1.67
|0.139
|-
|80%
|9
|16
|1.78
|0.148
|-
|60%
|6.3
|12
|1.90
|0.159
|-
|40%
|5.7
|8
|1.40
|0.117
|}
Assemblers making construction parts take:
{| class="wikitable"
|+
!Assembler
!Wood per assembler
|-
|Mk1
|4.5
|-
|Mk2
|9
|-
|Mk3
|18
|-
|Robotic
|36
|}
Using these results the saplings needed per assembler can be calculated, depending on your choice of assembler and harvesting option.  Using 45 "tiles" per sapling or 2.81 (45/16) "designations", the designations per assembler can be calculated to compute the necessary forestry size
{| class="wikitable"
!Cut option
!100%
!80%
!60%
!40%
|-
|Wood/sapling/ 60 sec:
|0.139
|0.148
|0.159
|0.117
|-
|Assembler Mk1
|91
|85
|80
|108
|-
|Mk2
|182
|171
|159
|216
|-
|Mk3
|365
|342
|319
|433
|-
|Mk4
|729
|683
|638
|866
|}
Therefore, using the 80% harvesting option, 3 Assembler Mk2 require 171 designations each or a total of 512, which is a square roughly 23 by 23.


{{Footer Infobox}}
{{Footer Infobox}}

Revision as of 16:41, 19 April 2024

Buildings (For Vehicles).png
Forestry Control Tower
Forestry Control Tower.png
Construction
Construction Parts.png
20
WorkersNone
ElectricityNone
MaintenanceNone
Footprint4x4
Required ResearchTree Planting
DesignationBuildings (For Vehicles) Buildings (For Vehicles).png

The Forestry Control Tower is a building to fully automated producing of Woods. Successful forestry setup consists of four parts:

  • designation of a control area
  • creation of Forestry Designations within that control area
  • assignment of Tree Planters and Tree Harvesters to the Tower
    *Do not forget to assign pickups to each Tree Harvester.
  • supply of Tree Saplings

Then, the Planter will plant Tree Saplings and the Harvesters will cut grown trees.

Forestry Designations is assigned to the Tower unlike Mining Designation, and the Designation will be deleted when the Tower is deconstructed.

Harvesting options

The Forestry Control Tower has a "Harvesting Options," that decides the size the trees should be cut. 100% is a standard option, and it maximizes the number of the harvested Wood from each tree sapling. 60% can minimize the area for tree growing, but a +67% more Tree Saplings are required than 100%.

Harvesting Options
Option Harvested Wood
per each tree
Harvest from planting
100% 20 12.0 years
80% 16 9.0 years
60% 12 6.3 years
40% 8 5.7 years

Control area, Vehicle assignments, and Idle vehicles

See Mine Control Tower.

Throughput of Wood harvesting

Tree Planter plants one Tree Saplings per about 45 cells on average. If Harvesting Options is 100%, it takes 12 years (8640 Clock.png ) to grow them and one grown tree will be 20 Woods. So, for example, the area for harvesting 1 / 60 Clock.png of Woods is:

45 / (20 × 60 / 8640) = 324 cells (20.2 Forestry Designated tiles)

In other options, the throughput is shown in the following table:

Required area and Tree Saplings to harvest 1 / 60 Clock.png of Wood (version 0.5.3)
Option Tree Saplings
( / 60 Clock.png )
Area
in cells in designated tiles
100% 0.0500 324 20.2
80% 0.0625 304 19.0
60% 0.0833 284 17.8
40% 0.1250 385 24.1

More Math

Using the math above the wood generated per sapling per month ( / 60 Clock.png ) can be computed.

Option Years Wood Wood/sapling/year Wood/sapling / 60 Clock.png
100% 12 20 1.67 0.139
80% 9 16 1.78 0.148
60% 6.3 12 1.90 0.159
40% 5.7 8 1.40 0.117

Assemblers making construction parts take:

Assembler Wood per assembler
Mk1 4.5
Mk2 9
Mk3 18
Robotic 36

Using these results the saplings needed per assembler can be calculated, depending on your choice of assembler and harvesting option. Using 45 "tiles" per sapling or 2.81 (45/16) "designations", the designations per assembler can be calculated to compute the necessary forestry size

Cut option 100% 80% 60% 40%
Wood/sapling/ 60 sec: 0.139 0.148 0.159 0.117
Assembler Mk1 91 85 80 108
Mk2 182 171 159 216
Mk3 365 342 319 433
Mk4 729 683 638 866

Therefore, using the 80% harvesting option, 3 Assembler Mk2 require 171 designations each or a total of 512, which is a square roughly 23 by 23.