Difference between revisions of "Cooled Caster II"

From Captain of Industry Wiki
Jump to: navigation, search
m (fix price)
Line 5: Line 5:
| Recipe        =  
| Recipe        =  
   {{Machine Recipe
   {{Machine Recipe
     | Input2Name = Construction Parts III
     | Input1Name = Construction Parts III
     | Input2Qty   = 20
     | Input1Qty   = 40
}}
}}
| Workers      = 6
| Workers      = 6

Revision as of 16:49, 9 July 2022

Metallurgy & Smelting.png
Cooled Caster II
T2
Cooled Caster II.png
Casts molten materials into slabs. This one also utilizes water for cooling to speed up the process.
Construction
Construction Parts III.png
40
WorkersWorker.png 6
ElectricityNone
MaintenanceNone
Footprint7x5
Required ResearchAdvanced Smelting
DesignationMetallurgy & Smelting Metallurgy & Smelting.png
VariantsCooled Caster

The Cooled Caster II is a direct upgrade of the Cooled Caster machine. It features an identical footprint, input/output locations, and recipe ratios with the only difference being a higher overall throughput. Visually the machine is identical to its predecessor with the exception of the crane supports and built-in conveyor belt being yellow.

Recipes

8
Molten Steel.png
24
Plus.png
4
Water.png
12
20 Clock.png
Transform.png
60 Clock 60s.png
8
Steel.png
24