Difference between revisions of "Cooling Tower (Large)"

From Captain of Industry Wiki
Jump to: navigation, search
m (: +{{recipe fetch|isbldg=yes}})
Line 6: Line 6:
   {{Machine Recipe
   {{Machine Recipe
     | Input1Name  = Construction Parts III
     | Input1Name  = Construction Parts III
     | Input1Qty  = 80
     | Input1Qty  = 60
     | Input2Name  = Concrete Slab
     | Input2Name  = Concrete Slab
     | Input2Qty  = 200
     | Input2Qty  = 150
}}
}}
| Workers      = 4
| Workers      = 4
Line 15: Line 15:
| Footprint    = 9x9
| Footprint    = 9x9
| Research      = Nuclear Reactor
| Research      = Nuclear Reactor
| Designation  = Power Production
| Designation  = Water Extraction & Processing
| Variants      = [[Cooling Tower]]
| Variants      = [[Cooling Tower]]
}}
}}
Line 22: Line 22:
While it is designed for use in [[Nuclear Reactor]] setups as its throughput is an exact match, it could theoretically be used to recover water from any steam byproduct. It can process the resulting steam output from up to 24 [[Arc Furnace II]] machines or 6 [[Exhaust Scrubber]]s.
While it is designed for use in [[Nuclear Reactor]] setups as its throughput is an exact match, it could theoretically be used to recover water from any steam byproduct. It can process the resulting steam output from up to 24 [[Arc Furnace II]] machines or 6 [[Exhaust Scrubber]]s.


==Recipes==
== Recipes ==
{{recipe define
{{recipe define
   | Input1Name  = Steam Hi
   | Input1Name  = Steam Hi
   | Input1Qty  = 48
   | Input1Qty  = 16
   | Time        = 10
   | Time        = 10
   | Output1Name = Water
   | Output1Name = Water
   | Output1Qty  = 40
   | Output1Qty  = 12
}}
}}
{{recipe define
{{recipe define
   | Input1Name  = Steam Lo
   | Input1Name  = Steam Lo
   | Input1Qty  = 48
   | Input1Qty  = 16
   | Time        = 10
   | Time        = 10
   | Output1Name = Water
   | Output1Name = Water
   | Output1Qty  = 40
   | Output1Qty  = 12
}}
}}
{{recipe define
{{recipe define
   | Input1Name  = Steam Depleted
   | Input1Name  = Steam Depleted
   | Input1Qty  = 48
   | Input1Qty  = 16
   | Time        = 10
   | Time        = 10
   | Output1Name = Water
   | Output1Name = Water
   | Output1Qty  = 40
   | Output1Qty  = 12
}}
}}
{{recipe fetch|isbldg=yes}}
{{recipe fetch|isbldg=yes}}


{{Navbox/Machines}}
{{Navbox/Machines}}

Revision as of 21:33, 9 June 2022

Water Extraction & Processing.png
Cooling Tower (Large)
T2
Cooling Tower (Large).png
Improves Water efficiency of a power plant by recovering some Steam back to Water.
Construction
Construction Parts III.png
60
+
Concrete Slab.png
150
WorkersWorker.png 4
ElectricityNone
MaintenanceNone
Footprint9x9
Required ResearchNuclear Reactor
DesignationWater Extraction & Processing Water Extraction & Processing.png
VariantsCooling Tower

The Cooling Tower (Large) is a much higher throughput and physically much larger variant of the Cooling Tower which allows for the conversion of Steam (High), Steam (Low), and Steam Depleted byproducts into Water. As the ratio of Water to all types of steam is 1:1, the Cooling Tower (Large) thus recovers 83.3% of the Water contained therein. Compared to the Cooling Tower, this marks a 33% increase in the Water recovery rate.

While it is designed for use in Nuclear Reactor setups as its throughput is an exact match, it could theoretically be used to recover water from any steam byproduct. It can process the resulting steam output from up to 24 Arc Furnace II machines or 6 Exhaust Scrubbers.

Recipes

16
Steam (High).png
96
10 Clock.png
Transform.png
60 Clock 60s.png
10
Water.png
60
16
Steam (Low).png
96
10 Clock.png
Transform.png
60 Clock 60s.png
12
Water.png
72
16
Steam (Super).png
96
10 Clock.png
Transform.png
60 Clock 60s.png
8
Water.png
48
16
Steam Depleted.png
96
10 Clock.png
Transform.png
60 Clock 60s.png
12
Water.png
72