Difference between revisions of "Metal Caster II"

From Captain of Industry Wiki
Jump to: navigation, search
m (: +{{recipe fetch|isbldg=yes}})
m (Update parameters in infobox machine)
Line 5: Line 5:
| Recipe        =
| Recipe        =
   {{Machine Recipe
   {{Machine Recipe
     | Input1Name  = Construction Parts III
     | Input1Name  = Construction Parts II
     | Input1Qty  = 20
     | Input1Qty   = 40
    | Input2Name  = Steel
    | Input2Qty   = 20
   }}
   }}
| Workers      = 3
| Workers      = 3

Revision as of 01:00, 18 August 2022

Metallurgy & Smelting.png
Metal Caster II
T2
Metal Caster II.png
Casts molten materials into slabs.
Construction
Construction Parts II.png
40
+
Steel.png
20
WorkersWorker.png 3
ElectricityNone
MaintenanceNone
Footprint7x5
Required ResearchAdvanced Smelting
DesignationMetallurgy & Smelting Metallurgy & Smelting.png
VariantsMetal Caster

The Metal Caster II is a direct upgrade of the Metal Caster machine. It is used to cast Molten Iron into Iron and Molten Copper into Impure Copper. It features an identical footprint, input/output locations, and recipe ratios with the only differences being a higher overall throughput and the requirement of 1 additional Worker. Visually the machine is identical to its predecessor with the exception of the crane supports and built-in conveyor belt being yellow.

Recipes

8
Molten Copper.png
24
20 Clock.png
Transform.png
60 Clock 60s.png
8
Impure Copper.png
24
8
Molten Iron.png
24
20 Clock.png
Transform.png
60 Clock 60s.png
8
Iron.png
24