Difference between revisions of "High-Pressure Turbine II"

From Captain of Industry Wiki
Jump to: navigation, search
m (Vekking moved page High-Pressure Turbine II to High-Pressure Turbine II: Align Title Case usage for page titles)
m (needs twice as many workers as Turbine I)
Line 16: Line 16:
| Variants      = [[High-pressure Turbine]]</br>[[Low-pressure Turbine]]</br>[[Low-pressure Turbine II]]
| Variants      = [[High-pressure Turbine]]</br>[[Low-pressure Turbine]]</br>[[Low-pressure Turbine II]]
}}
}}
The '''High-pressure Turbine II''' is a direct upgrade of the [[High-pressure Turbine]]. Compared to the High-pressure Turbine, it can accept twice as much {{infoicon|Steam Hi}}, generates twice as much [[Mechanical Power]] and has twice the [[Maintenance]] cost, but only requires 33% more {{infoicon|Worker|ui-yes|plural=s}}. It has the same footprint, has the same inputs/outputs, and the input/output locations line up exactly the same.
The '''High-pressure Turbine II''' is a direct upgrade of the [[High-pressure Turbine]]. Compared to the High-pressure Turbine, it can accept twice as much {{infoicon|Steam Hi}}, generates twice as much [[Mechanical Power]], has twice the [[Maintenance]] cost and requires twice the {{infoicon|Worker|ui-yes|plural=s}}. It has the same footprint, has the same inputs/outputs, and the input/output locations line up exactly the same.


==Recipes==
==Recipes==

Revision as of 16:27, 17 July 2022

Power Production.png
High-pressure Turbine II
T2
High-pressure Turbine II.png
Uses high pressure steam to create mechanical power.
Construction
Construction Parts III.png
60
WorkersWorker.png 4
ElectricityNone
MaintenanceMaintenance I.png 3.0 / 60 Clock.png
Footprint7x5
Required ResearchPower Generation IV
DesignationPower Production Power Production.png
VariantsHigh-Pressure Turbine
Low-Pressure Turbine
Low-Pressure Turbine II

The High-pressure Turbine II is a direct upgrade of the High-Pressure Turbine. Compared to the High-pressure Turbine, it can accept twice as much Steam (High), generates twice as much Mechanical Power, has twice the Maintenance cost and requires twice the Workers. It has the same footprint, has the same inputs/outputs, and the input/output locations line up exactly the same.

Recipes

8
Steam (High).png
48
10 Clock.png
Transform.png
60 Clock 60s.png
 
Mechanical Power.png
12 MW
Plus.png
8
Steam (Low).png
48