Difference between revisions of "Slag Crushed"

From Captain of Industry Wiki
Jump to: navigation, search
m
m (added Footer Infobox)
 
Line 9: Line 9:
Slag Crushed can be dumped and used as landfill, to include filling in the [[ocean]], just as it's un-crushed Slag variant. [[Farm]]s cannot be built, even partially, directly on top of Slag Crushed and it will prevent its placement.
Slag Crushed can be dumped and used as landfill, to include filling in the [[ocean]], just as it's un-crushed Slag variant. [[Farm]]s cannot be built, even partially, directly on top of Slag Crushed and it will prevent its placement.


{{recipe fetch|dir=out}}
{{Footer Infobox}}
{{recipe fetch|dir=in}}

Latest revision as of 16:28, 5 May 2023

Slag Crushed is a semi-processed loose material which used solely as a filler material in the production of Concrete Slabs. It is created by processing Slag in a Crusher and is used in both the Concrete Mixer and Concrete Mixer II.

Slag Crushed can be dumped and used as landfill, to include filling in the ocean, just as it's un-crushed Slag variant. Farms cannot be built, even partially, directly on top of Slag Crushed and it will prevent its placement.

Recipes

Below are all the recipes, which contain this item. Note, that some of them may be locked behind Research, and not immediately available in your game.

Production

Crusher.png
:
8
Slag.png
24
20 Clock.png
Transform.png
60 Clock 60s.png
8
Slag Crushed.png
24
Crusher (Large).png
:
48
Slag.png
144
20 Clock.png
Transform.png
60 Clock 60s.png
48
Slag Crushed.png
144
Mining.png
Transform.png
Slag Crushed.png

Consumption

Concrete Mixer.pngTier I
:
1
Cement.png
1.5
Plus.png
2
Manufactured Sand.png
3
Plus.png
6
Slag Crushed.png
9
Plus.png
4
Water.png
6
40 Clock.png
Transform.png
60 Clock 60s.png
8
Concrete Slab.png
12
Concrete Mixer.pngTier I
:
1
Cement.png
1.5
Plus.png
2
Sand.png
3
Plus.png
6
Slag Crushed.png
9
Plus.png
4
Water.png
6
40 Clock.png
Transform.png
60 Clock 60s.png
8
Concrete Slab.png
12
Concrete Mixer II.pngTier II
:
1
Cement.png
3
Plus.png
2
Manufactured Sand.png
6
Plus.png
6
Slag Crushed.png
18
Plus.png
4
Water.png
12
20 Clock.png
Transform.png
60 Clock 60s.png
8
Concrete Slab.png
24
Concrete Mixer II.pngTier II
:
1
Cement.png
3
Plus.png
2
Sand.png
6
Plus.png
6
Slag Crushed.png
18
Plus.png
4
Water.png
12
20 Clock.png
Transform.png
60 Clock 60s.png
8
Concrete Slab.png
24
Concrete Mixer III.pngTier III
:
2
Cement.png
6
Plus.png
4
Manufactured Sand.png
12
Plus.png
12
Slag Crushed.png
36
Plus.png
8
Water.png
24
20 Clock.png
Transform.png
60 Clock 60s.png
16
Concrete Slab.png
48
Concrete Mixer III.pngTier III
:
2
Cement.png
6
Plus.png
4
Sand.png
12
Plus.png
12
Slag Crushed.png
36
Plus.png
8
Water.png
24
20 Clock.png
Transform.png
60 Clock 60s.png
16
Concrete Slab.png
48
Slag Crushed.png
Transform.png
Dumping.png