Copper Ore Crushed

From Captain of Industry Wiki
Revision as of 03:26, 30 January 2022 by Thadius856 (talk | contribs) (typo)
Jump to: navigation, search
Copper Ore Crushed
Copper Ore Crushed.png

Copper Ore Crushed is a semi-processed loose material which is used in the late-game in the production of Copper. It is created by processing Copper Ore in a Crusher and is used in both the Blast Furnace II and Arc Furnace II.

Comparison to similar processes

Recipes utilizing Copper Ore Crushed add complexity to smelting arrays by demanding the Copper Ore first be processed into Crushed Copper Ore and requiring additional filler materials. In exchange, these recipes greatly improve the amount of Molten Copper that can be produced per unit of Copper Ore and decrease undesirable byproducts.

Copper Ore Crushed smelting in a Blast Furnace II vs Copper Ore smelting in a Blast Furnace:

  • −50% Copper Ore efficiency
  • +50% Molten Copper throughput
  • +2 / 20 Clock.png Sand required


Copper Ore Crushed smelting in an Arc Furnace II vs Copper Ore smelting in a Blast Furnace:

  • −50% Copper Ore efficiency
  • +50% Molten Copper throughput
  • −87.5% Coal usage (4 Coal vs 1 Graphite)
  • +2 / 20 Clock.png Sand required
  • +4 / 20 Clock.png Water required
  • −50% Slag byproduct
  • −50% Exhaust byproduct
Machine Input Output
Blast Furnace Copper Ore
Coal
9 / 20 Clock.png (27 / 60 Clock 60s.png)
4 / 20 Clock.png (12 / 60 Clock 60s.png)
Transform.png Molten Copper
Slag
Exhaust
8 / 20 Clock.png (24 / 60 Clock 60s.png)
6 / 20 Clock.png (18 / 60 Clock 60s.png)
4 / 20 Clock.png (12 / 60 Clock 60s.png)
Blast Furnace II Copper Ore Crushed
Coal
Sand
9 / 20 Clock.png (27 / 60 Clock 60s.png)
4 / 20 Clock.png (12 / 60 Clock 60s.png)
2 / 20 Clock.png (6 / 60 Clock 60s.png)
Transform.png Molten Copper
Slag
Exhaust
12 / 20 Clock.png (36 / 60 Clock 60s.png)
6 / 20 Clock.png (18 / 60 Clock 60s.png)
4 / 20 Clock.png (12 / 60 Clock 60s.png)
Arc Furnace II Copper Ore Crushed
Sand
Graphite
Water
9 / 20 Clock.png (27 / 60 Clock 60s.png)
2 / 20 Clock.png (6 / 60 Clock 60s.png)
1 / 20 Clock.png (3 / 60 Clock 60s.png)
4 / 20 Clock.png (12 / 60 Clock 60s.png)
Transform.png Molten Copper
Slag
Steam (High)
Exhaust
12 / 20 Clock.png (36 / 60 Clock 60s.png)
4 / 20 Clock.png (12 / 60 Clock 60s.png)
4 / 20 Clock.png (12 / 60 Clock 60s.png)
2 / 20 Clock.png (6 / 60 Clock 60s.png)


Production

Crusher.png
:
12
Copper Ore.png
36
20 Clock.png
Transform.png
60 Clock 60s.png
12
Copper Ore Crushed.png
36
Crusher (Large).png
:
72
Copper Ore.png
216
20 Clock.png
Transform.png
60 Clock 60s.png
72
Copper Ore Crushed.png
216
Mining.png
Transform.png
Copper Ore Crushed.png

Consumption

Arc Furnace II.pngTier II
:
12
Copper Ore Crushed.png
36
Plus.png
2
Sand.png
6
Plus.png
1
Graphite.png
3
Plus.png
2
Water.png
6
20 Clock.png
Transform.png
60 Clock 60s.png
16
Molten Copper.png
48
Plus.png
6
Slag.png
18
Plus.png
2
Steam (Low).png
6
Plus.png
4
Exhaust.png
12
Blast Furnace II.pngTier II
:
12
Copper Ore Crushed.png
36
Plus.png
2
Sand.png
6
Plus.png
5
Coal.png
15
20 Clock.png
Transform.png
60 Clock 60s.png
16
Molten Copper.png
48
Plus.png
6
Slag.png
18
Plus.png
12
Exhaust.png
36
Copper Ore Crushed.png
Transform.png
Dumping.png