Difference between revisions of "Arc Furnace II"
Thadius856 (talk | contribs) m (typo) |
Thadius856 (talk | contribs) m (→: remove unused tier/image params) |
||
Line 2: | Line 2: | ||
| Name = Arc Furnace II | | Name = Arc Furnace II | ||
| Tier = 2 | | Tier = 2 | ||
| Description = This furnace has a cooling system to safely reach higher operating temperatures. This provides increased throughput and an opportunity to reuse some of the excess heat. Power requirements are increased as well. | | Description = This furnace has a cooling system to safely reach higher operating temperatures. This provides increased throughput and an opportunity to reuse some of the excess heat. Power requirements are increased as well. | ||
| Recipe = | | Recipe = |
Revision as of 20:41, 20 January 2022
Construction | |
Workers | 24 |
Electricity | 2 MW |
Maintenance | 2.0 / 60 |
Footprint | 9x6 |
Required Research | Arc Furnace II |
Designation | Metallurgy & Smelting |
Variants | Arc Furnace |
An Arc Furnace II is a direct upgrade from the Arc Furnace machine. It carries twice the already-hefty Worker and Electricity requirement in addition to Water, some of which can be recovered by passing the byproduct Steam (High) through Cooling Towers. In exchange, it doubles throughput of Silicon smelting.
Additionally, it incorporates smelting recipes for Iron Ore Crushed, Copper Ore Crushed, and Glass Mix similar to those available in the Blast Furnace II which make it possible to replace all Blast Furnace II machines on the island. Notable differences between these recipes are that the Arc Furnace II requires a small amount of Graphite instead of a large amount of Coal. This change reduces the overall Coal requirement drastically for smelting Iron or Copper by 87.5% (12 /60s vs 1.5 /60s) and for smelting Glass by 90% (15 /60s vs 1.5 /60s). Both recipes also produce 50% less Exhaust per unit produced.