Question: What to build first?
Build 6xResearch Lab. Run simulation until build is completed. Save game v3.04. 180xConstruction Parts. Ends on 19-Jan-0001.
Build a 0.4xIron/day production. Run simulation until build is completed. Save game v3.05. 78xConstruction Parts. Ends on 06-Feb-0001.
Start harvesting trees. Save game v3.06. Ends on 06-Feb-0001.
Run simulation until research on "Construction" is completed. Save game v3.07. 0xIron. Ends on 15-Feb-0001.
Build 1xAssembly (Manual). Save game v3.08. 53xConstruction Parts. Ends on 15-Feb-0001.
Run simulation until we used 3xCoal to make 8xMolten Iron. Save game v3.09. 0xIron. Ends on 25-Feb-0001.
Run simulation until we used 3xCoal to make 8xMolten Iron. Save game v3.10. 0xIron. Ends on 5?-Mar-0001.
Pause Blast Furnace when recipe almost ready. Save game v3.11. 0xIron. Ends on 15?-Mar-0001.
- 3xIron to make 4xConstruction Parts.
Build:
- 1xVehicles Depot.
- 1xSmall Excavator.
- 1xMine Control Tower.
- ?xMetal Caster.
- ?xAssembly (Manual).
Question: What resources we need to build a ?xWood/day production?
Answer: To produce our own Wood we need to:
- Research:
- Nothing.
- Build:
- 1xTree Harvester.
- 1xPickup
Question: What resources we need to build a ?xCoal/day production?
Answer: To produce our own Coal we need to:
- Research:
- "Iron Smelting (from Scrap)".
- "Vehicles & Mining", requires "Iron Smelting (from Scrap)".
- Build:
- 1xVehicles Depot costing:
- 1xSmall Excavator costing:
- 40xVehicle Parts,
- 15xIron,
- 10xDiesel.
- 1xMine Control Tower costing:
- Total building costs:
- 60xConstruction Parts.
- 10xDiesel.
- 15xIron.
- 40xVehicle Parts.
- The 15xIron can be produced in a Metal Caster. This requires:
- 15xMolten Iron
- The 15xMolten Iron can be produced in a Blast Furnace. This requires:
- 15xIron Scrap.
- 5.63xCoal
Question: What resources we need to build a ?xConstruction Parts/day production?
Answer: To produce our own Construction Parts we need to:
- Research:
- "Construction".
- Build:
- 1xBlast Furnace costing:
- 10xMolten Channel costing:
- 1xMetal Caster costing:
- 1xSmoke Stack costing:
- 1xAssembly (Manual) costing:
- Total building costs:
- 135xConstruction Parts.