Difference between revisions of "Walkthrough v3\Q&A"
From Captain of Industry Wiki
(→) |
|||
Line 15: | Line 15: | ||
* ?x[[Iron]] to make [[Construction Parts]]. | * ?x[[Iron]] to make [[Construction Parts]]. | ||
Build: | Build: | ||
* 1x[[ | * 1x[[Vehicles Depot]]. | ||
* 1x[[Small Excavator]]. | * 1x[[Small Excavator]]. | ||
* 1x[[Mine Control Tower]]. | * 1x[[Mine Control Tower]]. | ||
* ?x[[Metal Caster]]. | * ?x[[Metal Caster]]. | ||
* ?x[[Assembly (Manual)]]. | * ?x[[Assembly (Manual)]]. | ||
<hr> | |||
===Question: What resources we need to build a ?x[[Wood]]/day production?=== | ===Question: What resources we need to build a ?x[[Wood]]/day production?=== |
Revision as of 17:08, 14 January 2023
Question: What to build first?
Research:
- Construction.
- Vehicles & Mining.
Build:
- 1xBlast Furnace.
- 1xSmoke Stack.
- 1xMetal Caster.
- 5xMolten Channel.
Process:
Build:
Process:
- ?xIron to make Construction Parts.
Build:
- 1xVehicles Depot.
- 1xSmall Excavator.
- 1xMine Control Tower.
- ?xMetal Caster.
- ?xAssembly (Manual).
Question: What resources we need to build a ?xWood/day production?
Answer: To produce our own Wood we need to:
- Research:
- Nothing.
- Build:
- 1xTree Harvester.
- 1xPickup
Question: What resources we need to build a ?xCoal/day production?
Answer: To produce our own Coal we need to:
- Research:
- "Iron Smelting (from Scrap)".
- "Vehicles & Mining", requires "Iron Smelting (from Scrap)".
- Build:
- 1xVehicles Depot costing:
- 1xSmall Excavator costing:
- 40xVehicle Parts,
- 15xIron,
- 10xDiesel.
- 1xMine Control Tower costing:
- Total building costs:
- 60xConstruction Parts.
- 10xDiesel.
- 15xIron.
- 40xVehicle Parts.
- The 15xIron can be produced in a Metal Caster. This requires:
- 15xMolten Iron
- The 15xMolten Iron can be produced in a Blast Furnace. This requires:
- 15xIron Scrap.
- 5.63xCoal
Question: What resources we need to build a ?xConstruction Parts/day production?
Answer: To produce our own Construction Parts we need to:
- Research:
- "Construction".
- Build:
- 1xBlast Furnace costing:
- 10xMolten Channel costing:
- 1xMetal Caster costing:
- 1xSmoke Stack costing:
- 1xAssembly (Manual) costing:
- Total building costs:
- 135xConstruction Parts.