Difference between revisions of "Metal Caster II"
From Captain of Industry Wiki
Thadius856 (talk | contribs) (fix research) |
Thadius856 (talk | contribs) m (→: remove unused tier/image params) |
||
Line 2: | Line 2: | ||
| Name = Metal Caster II | | Name = Metal Caster II | ||
| Tier = 2 | | Tier = 2 | ||
| Description = Casts molten materials into slabs. | | Description = Casts molten materials into slabs. | ||
| Workers = 3 | | Workers = 3 |
Revision as of 20:41, 20 January 2022
Workers | 3 |
Electricity | None |
Maintenance | None |
Footprint | 7x5 |
Required Research | Advanced Smelting |
Designation | Metallurgy & Smelting |
The Metal Caster II is a direct upgrade of the Metal Caster machine. It is used to cast Molten Iron into Iron and Molten Copper into Impure Copper. It features an identical footprint, input/output locations, and recipe ratios with the only differences being a higher overall throughput and the requirement of 1 additional Worker. Visually the machine is identical to its predecessor with the exception of the crane supports and built-in conveyor belt being yellow.