===Question: What is the game time at the beginning of this step?=== | |||
Answer: At the begin of this step, the game time is 8 February 0001. | |||
===Question: How many and what type of buildings do we need to produce 0.2x [[Construction Parts]] per day?=== | ===Question: How many and what type of buildings do we need to produce 0.2x [[Construction Parts]] per day?=== | ||
Answer: | Answer: |
Revision as of 05:43, 21 December 2022
About this step
Question: What is the game time at the beginning of this step?
Answer: At the begin of this step, the game time is 8 February 0001.
Question: How many and what type of buildings do we need to produce 0.2x Construction Parts per day?
Answer: The recipe to produce Construction Parts is:
- 1xAssembly (Manual) can convert 3xIron+4xWood+4xBricks in 40/2xdays into 4xConstruction Parts.
This recipe takes 40/2=20 days. To find what can be done in one day, we have to divide the numbers by 20, so:
- 1xAssembly (Manual) can convert 0.15xIron+0.2xWood+0.2xBricks in one day into 0.2xConstruction Parts.
To produce 0.2xConstruction Parts per day we need 1xAssembly (Manual).