Difference between revisions of "Walkthrough v3\Step 7\Q&A"

From Captain of Industry Wiki
Jump to: navigation, search
()
 
Line 1: Line 1:
==About this step==
==About this step==
<hr>
===Question: What is the game time at the beginning of this step?===
===Question: What is the game time at the beginning of this step?===
Answer: At the begin of this step, the game time is 19 January 0001.
Answer: At the begin of this step, the game time is 19 January 0001.


<hr>
===Question: How many and what type of buildings do we need to produce 0.4x[[Construction Parts]] per day?===
===Question: How many and what type of buildings do we need to produce 0.4x[[Construction Parts]] per day?===
Answer:
Answer:
Line 11: Line 14:
To produce 0.4x[[Construction Parts]] per day we need 2x[[Assembly (Manual)]].
To produce 0.4x[[Construction Parts]] per day we need 2x[[Assembly (Manual)]].


<hr>
===Question: What resources do we have at the end of this step?===
===Question: What resources do we have at the end of this step?===
Answer: We have:
Answer: We have:
Line 23: Line 27:
* 160x[[Rubber]].
* 160x[[Rubber]].
* 120x[[Vehicle Parts]].
* 120x[[Vehicle Parts]].
<hr>

Latest revision as of 00:03, 3 January 2023

About this step


Question: What is the game time at the beginning of this step?

Answer: At the begin of this step, the game time is 19 January 0001.


Question: How many and what type of buildings do we need to produce 0.4xConstruction Parts per day?

Answer: The recipe to produce Construction Parts is:

This recipe takes 40/2=20 days. To find what can be done in one day, we have to divide the numbers by 20, so:

To produce 0.4xConstruction Parts per day we need 2xAssembly (Manual).


Question: What resources do we have at the end of this step?

Answer: We have: