Question: How many and what type of buildings do we need to produce 0.8x Construction Parts per day?
Answer: The recipe to produce Construction Parts is:
- 4xAssembly (Manual) can convert 3xIron+4xWood+4xBricks in 40/2xdays into 4xConstruction Parts.
This recipe takes 40/2=20 days. To find what can be done in one day, we have to divide the numbers by 20, so:
- One Assembly (Manual) can convert 0.15xIron + 0.2xWood + 0.2xBricks in one day into 0.2xConstruction Parts.
To produce 0.8xConstruction Parts per day we need 4xAssembly (Manual).
Question: How many and what type of resources do we need per day to produce 0.8x Construction Parts per day?
Answer:
- One Assembly (Manual) can convert 0.6xIron + 0.8xWood + 0.8xBricks in one day into 0.8xConstruction Parts.
- The given recipe: One Metal Caster can convert 8x Molten Iron in 40/2x days into 8x 8x iron.
- The daily production of Iron is 8/20=0.4 Iron/day.
- Per day one Metal Caster converts 0.4x Molten Iron into 0.4x Iron.
- Per day one Blast Furnace converts 0.8x Iron Scrap + 0.3 Coal into 0.8x Molten Iron + 0.6x Exhaust.
If we combine these we get:
- Per day 2x Metal Caster + 1x Blast Furnace convert 0.8x Iron Scrap + 0.3 Coal into 0.8x Iron + 0.6x Exhaust.
Question: If we have:
- ?
- ?
for how many days will our stocks last?
Answer: ?