Difference between revisions of "Walkthrough v3\Step 7\Q&A"

From Captain of Industry Wiki
Jump to: navigation, search
Line 2: Line 2:
Answer:
Answer:
The recipe to produce [[Construction Parts]] is:
The recipe to produce [[Construction Parts]] is:
* An [[Assembly (Manual)]] can convert 3x[[Iron]]+4x[[Wood]]+4x[[Bricks]] in 40/2xdays into 4x[[Construction Parts]].
* 4x[[Assembly (Manual)]] can convert 3x[[Iron]]+4x[[Wood]]+4x[[Bricks]] in 40/2xdays into 4x[[Construction Parts]].
This recipe takes 40/2=20 days. To find what can be done in one day, we have to divide the numbers by 20, so:
This recipe takes 40/2=20 days. To find what can be done in one day, we have to divide the numbers by 20, so:
* An [[Assembly (Manual)]] can convert 0.15x[[Iron]] + 0.2x[[Wood]] + 0.2x[[Bricks]] in one day into 0.2x[[Construction Parts]].
* One [[Assembly (Manual)]] can convert 0.15x[[Iron]] + 0.2x[[Wood]] + 0.2x[[Bricks]] in one day into 0.2x[[Construction Parts]].
To produce 0.8x[[Construction Parts]] per day we need 4x[[Assembly (Manual)]].


* The daily production of [[Construction Parts]] is 0.2.
===Question: How many and what type of resources do we need per day to produce 0.8x [[Construction Parts]] per day?===
* We aim to produce 0.8x [[Construction Parts]] per day and therefor require 4x [[Assembly (Manual)]].
Answer:
* One [[Assembly (Manual)]] can convert 0.6x[[Iron]] + 0.8x[[Wood]] + 0.8x[[Bricks]] in one day into 0.8x[[Construction Parts]].


* The given recipe: One [[Metal Caster]] can convert 8x [[Molten Iron]] in 40/2x days into 8x [[8x iron]].
* The given recipe: One [[Metal Caster]] can convert 8x [[Molten Iron]] in 40/2x days into 8x [[8x iron]].

Revision as of 07:17, 15 December 2022

Question: How many and what type of buildings do we need to produce 0.8x Construction Parts per day?

Answer: The recipe to produce Construction Parts is:

This recipe takes 40/2=20 days. To find what can be done in one day, we have to divide the numbers by 20, so:

To produce 0.8xConstruction Parts per day we need 4xAssembly (Manual).

Question: How many and what type of resources do we need per day to produce 0.8x Construction Parts per day?

Answer:

  • Per day one Metal Caster converts 0.4x Molten Iron into 0.4x Iron.
  • Per day one Blast Furnace converts 0.8x Iron Scrap + 0.3 Coal into 0.8x Molten Iron + 0.6x Exhaust.

If we combine these we get:

  • Per day 2x Metal Caster + 1x Blast Furnace convert 0.8x Iron Scrap + 0.3 Coal into 0.8x Iron + 0.6x Exhaust.

Question: If we have:

  • ?
  • ?

for how many days will our stocks last?
Answer: ?