The '''Low-pressure Turbine II''' is a direct upgrade of the [[Low-pressure Turbine]] machine. Compared to the Low-pressure Turbine, it can accept twice as much | The '''Low-pressure Turbine II''' is a direct upgrade of the [[Low-pressure Turbine]] machine. Compared to the Low-pressure Turbine, it can accept twice as much {{infoicon|Steam Lo}}, generates twice as much [[Mechanical Power]] and has twice the [[Maintenance]] cost, but only requires 50% more [[Worker]]s. It has the same footprint, has the same inputs/outputs, and the input/output locations line up exactly the same. | ||
The Low-pressure Turbine II contains a shift which runs laterally through it with outputs on both ends. This shaft must be connected directly to a [[Power Generator]] (or variant thereof) to generate [[Electricity]]. | The Low-pressure Turbine II contains a shift which runs laterally through it with outputs on both ends. This shaft must be connected directly to a [[Power Generator]] (or variant thereof) to generate [[Electricity]]. |
Revision as of 05:48, 22 January 2022
Construction | |
Workers | 6 |
Electricity | None |
Maintenance | 2.0 / 60 |
Footprint | 7x5 |
Required Research | Power Generation IV |
Designation | Power Production |
Variants | Low-Pressure Turbine |
The Low-pressure Turbine II is a direct upgrade of the Low-Pressure Turbine machine. Compared to the Low-pressure Turbine, it can accept twice as much Steam (Low), generates twice as much Mechanical Power and has twice the Maintenance cost, but only requires 50% more Workers. It has the same footprint, has the same inputs/outputs, and the input/output locations line up exactly the same.
The Low-pressure Turbine II contains a shift which runs laterally through it with outputs on both ends. This shaft must be connected directly to a Power Generator (or variant thereof) to generate Electricity.