Difference between revisions of "Metal Caster II"

From Captain of Industry Wiki
Jump to: navigation, search
(fix research)
m (: remove unused tier/image params)
Line 2: Line 2:
| Name          = Metal Caster II
| Name          = Metal Caster II
| Tier          = 2
| Tier          = 2
| Image        =
| Description  = Casts molten materials into slabs.
| Description  = Casts molten materials into slabs.
| Workers      = 3
| Workers      = 3

Revision as of 20:41, 20 January 2022

Metallurgy & Smelting.png
Metal Caster II
T2
Metal Caster II.png
Casts molten materials into slabs.
WorkersWorker.png 3
ElectricityNone
MaintenanceNone
Footprint7x5
Required ResearchAdvanced Smelting
DesignationMetallurgy & Smelting Metallurgy & Smelting.png

The Metal Caster II is a direct upgrade of the Metal Caster machine. It is used to cast Molten Iron into Iron and Molten Copper into Impure Copper. It features an identical footprint, input/output locations, and recipe ratios with the only differences being a higher overall throughput and the requirement of 1 additional Worker. Visually the machine is identical to its predecessor with the exception of the crane supports and built-in conveyor belt being yellow.

Recipes

8
Molten Iron.png
20
24 Clock.png
Transform.png
60 Clock 60s.png
8
Iron.png
20
8
Molten Copper.png
20
24 Clock.png
Transform.png
60 Clock 60s.png
8
Impure Copper.png
20